NO. |
DESCRIPTION OF WORK |
1. |
Earthwork in Bank Cutting & Construction of minor RCC slab/RCC box bridges, construction of side drains, toewalls, retaining walls, drop walls, etc. in connection with proposed new additional loop line at Doongri, Vapi, Bhilad, & Umargaon stations on Virar Surat Section of Western Railways. |
2. |
Earthwork in bank, blanketing, construction of side drains, Toe walls, pitching etc between south end of Bridge No. 73 to North end of Bridge No. 75 including Panju Island (East side of existing track) between Bhayandar & Naigaon stations in connection with quadrupling of track between Borivali – Virar Section of Western Railway. |
|
|